Transparent, step-by-step guidance from your first conversation to move-in day. No surprises.
Every Citrus Glen home follows this proven process. Most families complete Steps 1–11 in 10–16 weeks.
A free 30-minute call or meeting with your DTC project coordinator. We discuss your goals, budget, timeline, and land situation. No pressure, no obligation.
Browse our three available plans — the Palmetto, Citrus, and Evergreen. Tour a model home if available in your area. Discuss customizations and upgrades with your coordinator.
Choose from our available parcels or bring your own land. We conduct a free site assessment: soil test, setback review, access road check, and utility availability confirmation.
Work with our preferred lending partners or your own lender to get pre-approved. We support conventional mortgages, construction loans, and land+home packages. Pre-approvals typically come back in 24–72 hours.
Sign the lot purchase or use agreement along with the home construction contract. Contracts are plain-language with no hidden fees. A DTC attorney reviews all documents before closing.
We submit all building permits to the county on your behalf. This includes site plans, wind load engineering, septic or utility hookup permits, and any HOA approvals required. We handle the bureaucracy so you don't have to.
Land clearing, grading, and site leveling. Driveway and utility trench installation. Foundation pad construction (concrete runners or piers per plan and soil report). Final inspection before home delivery.
Your modular home arrives from the factory in sections and is crane-set onto your prepared foundation. Most placements are completed in a single day. The home arrives 90–95% complete from the factory.
Electrical, plumbing, HVAC, and water connections are made by licensed Florida contractors. Exterior trim, siding, gutters, and landscaping are completed. Interior touch-ups finalized.
County inspectors visit to issue your Certificate of Occupancy (CO). We coordinate the inspection scheduling and attend with you. The CO is required before you can legally move in.
Your DTC project coordinator does a final walk-through with you, hands over your warranty documentation, and gives you the keys. Welcome home. A 1-year builder warranty covers all workmanship and materials.
Answer three quick questions to get a personalized timeline estimate for your project.
*Estimated total from first meeting to move-in. Permitting timeline varies by county.